Sponsor

Showing posts with label Transmission. Show all posts
Showing posts with label Transmission. Show all posts

Monday, July 6, 2015

Job: Access Transmission Fulfillment Engineer

By Unknown   Posted at  12:14 PM   Transmission No comments
Job:

Our client, a major telecommunication company, are currently looking to recruit an access transmission fulfilment engineer to join their team based in Guildford.
The main responsibilities are:
  • Perform integration and acceptance to operations in a controlled manner
  • Inter-working with access transmission tech leads and project teams
  • rollout of multiple access projects including DCN remedial, microwave activation
  • dealing with vendors, SWC and 3rd party suppliers
  • troubleshoot the faults caused due to network deployment
Essential criteria:
  • Experience in Access: Siae, Nokia, NEC, Ericsson microwave
  • Core: CX600, CSG ATN 950
  • U2000
Sent to : cvsend@comvergent.co.uk

Thursday, July 2, 2015

Training: Capacity Management (Radio - Transmission - Core)

By Abdillah Arifin Rahman Lubis   Posted at  6:40 AM   Transmission No comments
Capacity is the most issue in Network Planning and Optimization activities. Capacity problem impact Network KPI mostly in accessibility, give contribution in retainability degradation (ex. increasing drops) and integrity degradation (ex. low throughput). This training will give detail explanation to design capacity both in 2G & 3G networks in three main area : Radio, Transport and Core Network, also explain strategy to handle future traffic increment and traffic mobility.
Syllabus
Traffic Theory
  • Erlang B & Erlang C
  • QoS and GOS
  • Utilization and Occupancy Concept
  • Busy Hour and Busy Day Concept
Radio Capacity Management
  • 2G Radio Capacity & Dimensioning :
  • Control Channel
  • Traffic Channel
  • TCH Channel
  • SDCCH Channel
  • PDCH Channel for GPRS/EDGE
  • PCH Load and LAC Dimensioning
  • BSC Load
3G Radio Capacity & Dimensioning : 
  • Power
  • Channel Element
  • Code
  • RNC Load
Transport Capacity & Dimensioning :
  • Abis Dimensioning
  • Iub, IuCS, IuPS and Iur
  • Abis over IP and IP Transport
Core Capacity Management
  • CS Core Network Dimensioning :
  • Average Circuit Group (CGR) Utilization
  • Signalling Link Load
  • VLR Load
  • HLR Load
PS Core Network Dimensioning : 
  • SGSN Load
  • GGSN Load
  • Inter-GSN Traffic
  • DNS Load
  • DHCP Load
  • Firewall Load
  • Border Gateway Load
  • Charging Gateway Load
  • Core LAN Switch Load
Traffic Prediction and Forecasting
Capacity Overload Handling & Mitigation Plan
REGISTRATION AHMAD YAZID 
PHONE +6285878909415 
EMAIL contact@floatway.com

Back to top ↑
Connect with Us

    Powered by Blogger.

    Find Us On Facebook

    Followers

    About Our Blog

    Information about Telecommunication Computer and Job

What they says

© 2013 Informasi ICT Telekomunikasi dan Lowongan Kerja. WP AA Converted by admin kerja telco
admin. Proudly Powered by Kerja Telco.